Washington Dc-Restaurant
Project Specifications — Washington DC, USA
| Feature / Specification | Details |
|---|---|
| Project Location | Washington DC, USA |
| Project Type | Café / Restaurant |
| Scope of Work | Aluminum joinery, interior furniture, mirrors, woodwork, and metal works |
| Standards | Fully compliant with U.S. standards |
| Joinery System | 75 mm thermally insulated series |
| Glass Specification | 6mm + 16mm + 6mm Tempered Insulated Glass |
| Production Timeline | 6 Weeks |
| Packaging | Detailed and secure packaging for overseas shipment |
| Installation Support | Supervisor service (at critical points) |
| Collaboration | Joint design process with the architect and venue owner |
Project Specifications — Washington DC, USA
| Feature / Specification | Details |
|---|---|
| Project Location | Washington DC, USA |
| Project Type | Café / Restaurant |
| Scope of Work | Aluminum joinery, interior furniture, mirrors, woodwork, and metal works |
| Standards | Fully compliant with U.S. standards |
| Joinery System | 75 mm thermally insulated series |
| Glass Specification | 6mm + 16mm + 6mm Tempered Insulated Glass |
| Production Timeline | 6 Weeks |
| Packaging | Detailed and secure packaging for overseas shipment |
| Installation Support | Supervisor service (at critical points) |
| Collaboration | Joint design process with the architect and venue owner |
In Washington DC, we successfully completed a turnkey project for a café/restaurant, covering the aluminum joinery, interior furniture, mirrors, woodwork, and metal works. Throughout the design and production phases, we collaborated closely with both the architect and the venue owner to ensure the best balance of aesthetics, durability, and technical performance.
All products were manufactured in compliance with U.S. standards, fully meeting the technical requirements specified by the client. The joinery systems were produced with 75 mm thermally insulated profiles, and the glazing was made of 6mm + 16mm + 6mm tempered insulated glass, ensuring energy efficiency, safety, and comfort.
The entire manufacturing process was completed in just 6 weeks, after which the products were carefully packaged according to international shipping standards and delivered to the U.S. without any issues. Thanks to detailed packaging, all materials arrived safely on site. During the installation phase, our team also provided supervisor support, particularly for critical stages, to guarantee a smooth implementation.