Feature Details
Project LocationDakar, Senegal – Corniche District
Building Type7-Story Mixed-Use Building
Total Ceramic Area8,000 m²
Finished Joinery UnitsOver 200 glazed finished joinery elements
Glass Specification6mm + 16mm + 6mm Tempered Insulated Glass
Aluminum SystemWDT55 Thermally Insulated Series
Façade CladdingComposite Panels, Paint, Natural Stone (ground floor)
Glass Balustrades200m length, 1m height, 8’8 Laminated Tempered Glass
Additional ServicesOn-site supervisor support for installation
Production Period1.5 Months
LogisticsAll joinery, glass, and ceramics manufactured and delivered by us

Project Highlights—Dakar Corniche-Senegal

Feature Details
Project Location Dakar, Senegal – Corniche District
Building Type 7-Story Mixed-Use Building
Total Ceramic Area 8,000 m²
Finished Joinery Units Over 200 glazed finished joinery elements
Glass Specification 6mm + 16mm + 6mm Tempered Insulated Glass
Aluminum System WDT55 Thermally Insulated Series
Façade Cladding Composite Panels, Paint, Natural Stone (ground floor)
Glass Balustrades 200m length, 1m height, 8’8 Laminated Tempered Glass
Additional Services On-site supervisor support for installation
Production Period 1.5 Months
Logistics All joinery, glass, and ceramics manufactured and delivered by us

In Dakar, Senegal, located in the prominent Corniche district, we successfully delivered a comprehensive façade and joinery project for a 7-story building. A total of 8,000 m² of aluminum ceramic in various sizes and models was manufactured and integrated into the project. Among these, more than 200 finished glazed joinery units were produced and shipped to the site, ready for installation.

The glazing specification included 6mm + 16mm + 6mm tempered insulated glass, providing both safety and high thermal performance. For the aluminum systems, the WDT55 thermally insulated series was selected, offering an excellent balance of energy efficiency and cost-effectiveness.

On the exterior façade, a modern and elegant look was achieved by combining composite panels, painted surfaces, and natural stone cladding on the ground floor. All joinery, glass, and ceramic elements were produced by us and delivered to the construction site. In addition, we provided supervisor services to ensure proper installation and efficient project progress.

The project also included the production of approximately 200 meters of glass balustrades with a height of 1 meter, using 8’8 laminated tempered glass to ensure maximum durability and safety.

All production was completed within just 1.5 months and successfully delivered on time.